<3 PREPARATION>
3-2
IM 01R01A11-01EN
3.1 Package and Installation
Regarding the packaging and installation procedure, refer to IM 01R01A01-01E Part B.
3.2 AXF Write Protect Cancellation
3.2.1 Before Verication
1) AXF parameters are changed during the verication process. Cancel the write protect
switch.
Switch 1
Switch 2
Enable Protect
2 Burnout setting switch
1 Write protect setting switch
Hardware switch off
Set the "Write Protect Switch" to "Enable" before this verification.
Return the switch to the original position after this verification is
complete.
F030201-A.ai
(A) AXFA11
Hardware switch off
Set the "Write Protect Switch" to "Enable" before this verification.
Return the switch to the original position after this verification is
complete.
Switch 1
Switch 2
Enable Protect
2 Burnout setting switch
1
Write protect setting switch
F030201-B.ai
(B) AXFA14 or AXF Integral Flowmeter
Figure 3.2.1 Write Protect Cancellation
2) After the verication is complete, return the switch to the original position.